卫生间隔断施工工艺和技术措施  http://www.jnndjc.com
Construction technology and technical measures of toilet partition http://www.jnndjc.com
(一)施工准备
(1) Construction preparation
1、材料及安装工具:
1. Materials and installation tools:
(1)进入现场的隔板样式、数量及加工质量符合设计要求,有出厂合格证。
(1) The type, quantity and processing quality of the partition board entering the site shall meet the design requirements and have the factory certificate.
(2)五金配件的种类、规格、型号符合图纸要求,并与卫生间隔板相匹配且产品质量合格。
(2) The type, specification and model of hardware accessories shall meet the requirements of drawings, and match with the partition board of toilet, and the product quality shall be qualified.
(3)安装工具:电锤、改锥、电钻、螺丝刀等。
(3) Installation tools: electric hammer, screwdriver, electric drill, screwdriver, etc.
2、作业条件:
2. Operating conditions:
(1)卫生间隔断进入施工现场必须检查验收,安装前应先检查型号,尺寸是否符合要求。
(1) The toilet partition must be inspected and accepted before entering the construction site. Before installation, the model and size shall be checked to see if they meet the requirements.
(2)现场安装队实行队长负责制,由队长负责统筹协调施工期间的事宜。
(2) The on-site installation team shall implement the team leader responsibility system, and the team leader shall be responsible for overall coordination of matters during construction.
(3)严格按照施工程序,确保施工质量。
(3) Strictly follow the construction procedure to ensure the construction quality.
(4)注意卫生间隔断门板的开启方向及测量的尺寸,以确保安装时的门的裁口方向。
(4) Pay attention to the opening direction and measured size of the partition door plate of the toilet to ensure the cutting direction of the door during installation.
(二)施工工艺
(2) Construction technology
1、工艺流程: 现场检查---派线确位---安装标高---配件定位---安装调试---清理打胶---安装验收
1. Process flow: on site inspection - line dispatching and positioning - installation elevation - Accessories positioning - installation and debugging - cleaning and gluing - installation and acceptance
2、施工要点
2. Key points of construction
(1)现场检查:查看图纸复量尺寸,检查图纸与现场是否相符,检查瓷砖,卫生洁具等相关的成品有无损坏之处,特殊工艺的按照甲方和监理确认的施工图施工。
(1) On site inspection: check the re measurement size of the drawings, check whether the drawings are consistent with the site, check whether the tiles, sanitary wares and other related finished products are damaged, and the special process shall be constructed according to the construction drawings confirmed by Party A and the supervisor.
(2)派线确位:标好墙面尺寸,保持水平,垂直、大片应安在 两坑正中间(或按现场要求操作)。
(2) Setting out and positioning: mark the wall dimension, keep it horizontal, and install the vertical and large pieces in the middle of the two pits (or operate according to the site requirements).
(3)安装标高:根据测量的图纸检查卫生间隔断安装的标高尺寸。
(3) Installation elevation: check the elevation dimension of toilet partition installation according to the measured drawings.
(4)配件定位:按照标高,设计和监理确认通过的五金件(合页、门锁、拉手、支架、横梁)设计确认通过,安支架时保持两边间距尺寸一样,安大片直角时,保证在中间位置(分中),上下两端保持20公分,(直角中心点)根据情况有管道,腰线应量好尺寸,再开口,缝口不超过0.1厘米(直角), 注意不要打坏墙砖或地砖,安合页时,门上下两端保持20厘米,门下端与中小片高低一样,合页螺丝安装在(打眼时应控制在小于1厘米深度,尔后上螺丝,安锁时应注意如有台阶锁芯的位置距门下端85厘米,如有残疾人坑,应与有台阶锁位置一样平行,锁一定要端正,灵活自如,锭横梁应在中小片上固定螺丝或钉子,锭塑板或角铝应从反面安圆头螺丝固定,注意塑板与中小片无缝平整。
(4) Accessories positioning: according to the elevation, the hardware parts (hinge, door lock, handle, bracket, beam) confirmed by the design and the supervisor are confirmed to be passed. When installing the bracket, keep the same space size on both sides. When installing large right angles, ensure that the middle position (split Center) and the upper and lower ends are kept at 20cm. (right angle center point) there are pipes according to the situation, and the waist line should be measured Opening, seam not more than 0.1 cm (right angle), Pay attention not to damage the wall tiles or floor tiles. When installing the hinge, the upper and lower ends of the door shall be kept 20cm, and the lower end of the door shall be the same as the height of the small and medium pieces. The hinge screws shall be installed at (when drilling, it shall be controlled at a depth less than 1cm, and then the screws shall be installed later. When installing the lock, it shall be noted that if there is a step lock core, it shall be 85CM from the lower end of the door. If there is a pit for the disabled, it shall be parallel to the position of the step lock, and the key end of Positive, flexible and free, the spindle beam shall be fixed with screws or nails on the small and medium pieces, the spindle plastic plate or angle aluminum shall be fixed with round head screws from the reverse side, and the plastic plate and the small and medium pieces shall be seamless and flat.
(5)安装调试:调试固定门缝应2至2.5毫米的距离,小腿固定至少两颗螺丝,,门与中小片下端平齐,门的开启轻松自如,回归到位,对隔断门用线进行四边调正,门上下水平垂直,满足施工规范的要求。
(5) Installation and debugging: debugging and fixing the door seam should be 2 to 2.5mm away, at least two screws should be fixed on the lower leg, the door should be flush with the lower end of the small and medium pieces, the door can be opened easily and freely, and it can return to the place, the four sides of the partition door line should be adjusted, the upper and lower parts of the door should be horizontal and vertical, meeting the requirements of the construction specifications.
(6)清理打胶:打胶时应上下一条线,粗细一样,直角处没有多余的胶,其作用是保证隔板与墙体之间的更加牢固、密封。
(6) Cleaning and gluing: when gluing, the upper and lower lines shall be the same in thickness. There is no excess glue at the right angle. Its function is to ensure that the partition and the wall are more firm and sealed.
(7)安装完毕后指定专人看管,以防其他施工队伍在作业过程中损坏到本产品。
(7) After the installation, a special person shall be appointed to take care of it to prevent other construction teams from damaging the product during the operation.
(8)安装验收:安装完的卫生间隔断我方进行自检,经我方检验合格后报予监理、甲方进行验收。
(8) Installation acceptance: the toilet partition after installation shall be self inspected by us, and shall be submitted to the supervisor and Party A for acceptance after passing our inspection.
(三)质量标准
(3) Quality standard
1主控项目
1 main control items
隔间板隔墙工程所用材料的品种、规格、性能。图案和颜色应符合设计要求。
Type, specification and performance of materials used in partition works of partition board. The pattern and color shall meet the design requirements.
2一般项目
2 general items
(1)隔间板表面应色泽一致、平整洁净、清晰美观。
(1) The surface of compartment board shall be uniform in color, flat, clean, clear and beautiful.
(2)隔间板接缝应横平竖直,隔间板应无裂痕、缺损和划痕。
(2) The joint of compartment board shall be horizontal and vertical, and the compartment board shall be free of crack, defect and scratch.
(3)隔间板安装的允许偏差和检验方法应符合《建筑装饰装修工程施工质量验收规范》的规定。
(3) The allowable deviation and inspection method for the installation of partition board shall comply with the provisions of code for acceptance of construction quality of building decoration engineering.
(四)成品保护
(4) Finished product protection
1、隔间板安装完成后,对于进入隔间板安装完毕的卫生间需要施工的工种和人员实行登记制度,把成品保护工作落实到人。不允许无关人员进入安装好隔间板的卫生间现场。
1. After the installation of the partition board, the registration system shall be implemented for the type of work and personnel to be constructed in the toilet after the installation of the partition board, and the protection of the finished product shall be implemented to the personnel. Irrelevant personnel are not allowed to enter the toilet site where the partition board is installed.
2、隔间板安装完毕,挂上门锁或门插销,以防风吹碰坏隔间板。并随手关上卫生间的门及门锁。
2. After the installation of the compartment board, hang the door lock or door latch to prevent the compartment board from being damaged by the wind. Close the door and lock of the toilet.
http://www.jnndjc.com
大香伊蕉在人线国产75

大香伊蕉在人线国产75

联系人:李经理

电话:15954121087   移动电话:15153190187

邮箱: 1499873208@qq.com

地址:山东省济南市天桥区小清河北路滨河商务中心D座24层2402

2019最新免费v片久久乐哪家好?供应订做多少钱?济南临边防护栏怎么样?诚信公司专业以批发价格大量现货提供伊人久久精品视频在线、做卫生间隔断、无障碍扶手厂家、卫生间隔断怎么做等品质优良的产品,欢迎来电生产定制!
Copyright©www.jnndjc.com(复制链接) 大香伊蕉在人线国产75
大香伊蕉在人线国产75-伊人久久精品视频在线-2019最新免费v片久久乐